Case Studies
Case Study: Heavy-Duty Protection, Zero Damage, And Jobsite Peace Of Mind
February 11, 2026
Overview
For this residential builder, maintaining control on busy construction sites come down to two critical factors: dependable protection products and a partner they can rely on for timely delivery. Through working with this company on multiple projects, we’ve become a trusted resource for high quality, effect temporary surface protection in addition to stellar customer service and prompt lead times that allow site management to move through their project on time and damage-free.
The Challenge
Active construction environments involve a wide range of finished and in-progress surfaces that must be protected throughout the project’s lifecycle. From floors and elevators to glass, electronics, and installed finishes, each area presents its own risks. Without reliable protection, damage, reworks, and delays quickly pile up.
In addition to the protection material itself, installation time and labor efficiency are constant pressures on the jobsite. Protection methods that are slow to install or are physically demanding can detract from project schedules and crew productivity.
The Solution

This builder turned to us for a sitewide protection strategy. Our product range allowed them to protect every critical surface, including floor protection for active work areas, elevator protection in high-traffic zones, glass, and safe solutions for final installed products; we even had products on hand that worked to protect electronics in high-traffic zones, providing efficient dust and impact protection.
To further improve efficiency, the builder employed our Armour Floor Tape Dispenser and Armour Premium Film Applicator to streamline product installation. These tools significantly sped up application while reducing manual labor.
The Results

With our products in place, the team achieved consistent, thorough protection across all key areas, reducing the risk of damage and rework. Faster installation improved productivity, while easier application reduced physical strain on workers.
Equally important, prompt lead time and dependable delivery allowed projects to stay on schedule. Knowing protection materials would arrive when needed created smoother workflows and greater peace of mind onsite.
In their own words:
“There are two things that standout to Paragon Living about Axiom. One, the quality of products, and Two, the customer service and prompt lead times. Our overall experience with Axiom has been great, which makes life on site very manageable knowing Axiom can deliver with a high level of reliability. All of Axiom’s products have served our needs thoroughly; from floor protection to protection of elevators, glass, electronics, and for creating finish-safe work areas on the final-installed products. The Installation Tools such as the Tape Dispenser and Film Applicator have also drastically sped up the install time, while reducing demanding labour.”
Why Axiom
For this customer, two things stood out the most: the quality of our products and the level of customer service behind them. Every solution performed as expected (or exceeded expectations!), and the support team consistently delivered with professionalism and reliability.
This dependability allows project teams to focus on building, not fixing, making us a trusted partner from early construction through final finishes.